MattE

  • Single-phase unit for loads up to 7.4kW, with double pole MCB, Type 2 SPD, and load curtailment at 60A

    Single-phase unit for loads up to 7.4kW, with double pole MCB, Type 2 SPD, and load curtailment at 60A

    £318.72 Incl. VAT

    Out of Stock

    The SP-M-SPD single-phase protection device offers a compliant, simple, single connection centre, for EV charge point installations. Allowing connection to the existing TN-C-S earthing facility without the use earth electrodes. Designed to facilitate compliance with BS:7671 2018, Amendment 2: 2022 Regulation 722.411.4.1 (iv) The SP-MCXX-SPD units come complete with a double pole MCB and Type 2 SPD, and has the additional functionality for load curtailment, in line with Regulation 722.311.20. Isolating the charge point from the supply once the house-hold consumption rises above the pre-set limit, and automatically restores the power to the charge point when the load falls back within a satisfactory level. Please note, the load curtailment limit can be set at either, 60A, 80A, or 100A and must be selected at the time of order. · · · Built in matt:e PEN Fault Protection · · No Earth Electrodes Required · · Helps reduce disruptive and costly groundworks · · Removes the risk of striking buried services · · Simple wire in wire out connection · · Over current protection · · For loads up to 7.4kW · · Type 2 SPD · · Load curtailment · · Standard 1 Year parts warranty

  • Three-phase connection unit with auto rest isolator suitable for 1 x 63A TPN load with Type A RCBO

    Three-phase connection unit with auto rest isolator suitable for 1 x 63A TPN load with Type A RCBO

    £916.66 Incl. VAT

    Out of Stock

    The matt:e ARD connection centres provide a simple to install dedicated EV connection centre, with built in O-PEN® technology, that allows for the connection of EV charge points to the PME earthing facility without the use of earth electrodes. Helping to facilitate compliance with BS:7671. 2018 Amendment 1, 2020 Regulation 722.411.4.1.(iii). The matt:e ARD connection centres incorporate the unique 5 pole auto reset device that automatically restores power to the load once the fault has cleared. · · · Built in O-PEN® technology · · No Earth Electrodes Required · · Helps reduce disruptive and costly groundworks · · Removes the risk of striking buried services · · Simple wire in wire out connection · · Phase loss protection · · 63A 30mA TPN Type A RCBO · · Mild steel IP4X enclosure · · Standard 1 Year parts warranty

  • Connection Centre with O-PEN®, manual reset 5 pole isolator with 32A TPN Type A RCBO

    Connection Centre with O-PEN®, manual reset 5 pole isolator with 32A TPN Type A RCBO

    £1,142.28 Incl. VAT

    Out of Stock

    The EVU-2-32-TP-R from matt:e is simple, single dedicated connection unit with built in O-PEN technology, which allows for the connection of 2 x 32 amp TPN EV charge points to the existing PME earthing facility. The unit incorporates a 5 pole isolator with built-in UV release that disconnects all poles including CPC in the event of a fault, manually resettable in line with BS: 7671, 2018 Amendment 1 2020 Regulation 722.411.4.1 (iii) The O-PEN technology does not require earth rods or measuring electrodes to function correctly.The unit incorporates a 5 pole isolator with built-in UV release that disconnects all poles including CPC in the event of a fault, manually resettable in line with BS: 7671, 2018 Amendment 1 2020 Regulation 722.411.4.1 (iii)The O-PEN technology does not require earth rods or measuring electrodes to function correctly. · · · Built in O-PEN® technology · · No Earth Electrodes Required · · Helps reduce disruptive and costly groundworks · · Built in 5 pole mains isolator with manually resettable UV trip. · · Simple wire in wire out connection · · Phase loss protection · · With 2 x 32amp TPN RCBOs · · Mild steel IP4X enclosure · · Standard 1 Year parts warranty · · Designed and Built in the UK

  • Connection centre with O-PEN®, manual reset 5 pole isolator suitable for loads up to 100A

    Connection centre with O-PEN®, manual reset 5 pole isolator suitable for loads up to 100A

    £847.44 Incl. VAT

    Out of Stock

    The matt:e EVU connection centres provide a simple to install dedicated EV connection centre, with built in O-PEN® technology, that allows for the connection of EV charge points to the PME earthing facility without the use of earth electrodes.Helping to facilitate compliance with BS:7671. 2018 Amendment 1, 2020 Regulation 722.411.4.1.(iii). · · · Built in O-PEN® technology · · No Earth Electrodes Required · · Helps reduce disruptive and costly groundworks · · Removes the risk of striking buried services · · Simple wire in wire out connection · · Phase loss protection · · For 1 x 100A TPN load · · Mild steel IP4X enclosure · · Standard 1 Year parts warranty

  • Connection centre with O-PEN®, manual reset 5 pole isolator with 32A TPN Type A RCBO

    Connection centre with O-PEN®, manual reset 5 pole isolator with 32A TPN Type A RCBO

    £935.40 Incl. VAT

    Out of Stock

    The matt:e EVU connection centres provide a simple to install dedicated EV connection centre, with built in O-PEN® technology, that allows for the connection of EV charge points to the PME earthing facility without the use of earth electrodes.Helping to facilitate compliance with BS:7671. 2018 Amendment 1, 2020 Regulation 722.411.4.1.(iii). · · · Built in O-PEN® technology · · No Earth Electrodes Required · · Helps reduce disruptive and costly groundworks · · Removes the risk of striking buried services · · Simple wire in wire out connection · · Phase loss protection · · 1 x 32A TPN Type A RCBO · · Mild steel IP4X enclosure · · Standard 1 Year parts warranty

  • Matt:E 3 Phase 1 X 63Amp Unit With

    Matt:E 3 Phase 1 X 63Amp Unit With

    £864.00 Incl. VAT

    Out of Stock

    Technical Specifications  Technical Specifications Charging device for electric vehicles Installation side connection model 3-phase · Technical Data Sheet – Click to Download

  • Single-phase Automatic Reset PEN Fault Protection with Type 2 SPD

    Single-phase Automatic Reset PEN Fault Protection with Type 2 SPD

    £270.01 Incl. VAT

    Out of Stock

    The SP-ICXX-SPD single-phase protection device offers a compliant, simple, single connection centre, for EV charge point installations, allowing connection to the existing TN-C-S earthing facility without the use earth electrodes. Designed to facilitate compliance with BS:7671 2018, Amendment 2: 2022 Regulation 722.411.4.1 (iv). · · · Built in matt:e PEN Fault protection · · NO EARTH ELECTRODES REQUIRED · · Helps reduce disruptive and costly groundworks · · Removes the risk of striking buried services · · Simple wire in wire out connection · · For loads up to 7.4kW · · Type 2 SPD · · Standard 1 Year parts warranty

  • Single-phase PEN Fault protection and 100A MCB

    Single-phase PEN Fault protection and 100A MCB

    £194.40 Incl. VAT

    In Stock for Delivery

    Single-phase Automatic Reset PEN Fault Protection with MCB. · · · Built in matt:e PEN Fault Protection · · No Earth Electrodes Required · · Manual or auto reset function (PEN fault only) · · Available as 40A and 100A · · Small footprint · · Simple wire in wire out connection · · Standard 1 Year parts warranty

  • Single-phase unit for loads up to 7.4kW, with double pole MCB, Type 2 SPD, and load curtailment at 100A

    Single-phase unit for loads up to 7.4kW, with double pole MCB, Type 2 SPD, and load curtailment at 100A

    £318.72 Incl. VAT

    Out of Stock

    The SP-M-SPD single-phase protection device offers a compliant, simple, single connection centre, for EV charge point installations. Allowing connection to the existing TN-C-S earthing facility without the use earth electrodes. Designed to facilitate compliance with BS:7671 2018, Amendment 2: 2022 Regulation 722.411.4.1 (iv) The SP-MCXX-SPD units come complete with a double pole MCB and Type 2 SPD, and has the additional functionality for load curtailment, in line with Regulation 722.311.20. Isolating the charge point from the supply once the house-hold consumption rises above the pre-set limit, and automatically restores the power to the charge point when the load falls back within a satisfactory level. Please note, the load curtailment limit can be set at either, 60A, 80A, or 100A and must be selected at the time of order. · · · Built in matt:e PEN Fault Protection · · No Earth Electrodes Required · · Helps reduce disruptive and costly groundworks · · Removes the risk of striking buried services · · Simple wire in wire out connection · · Over current protection · · For loads up to 7.4kW · · Type 2 SPD · · Load curtailment · · Standard 1 Year parts warranty

  • 5 pole 100A MCB with built in PEN fault protection

    5 pole 100A MCB with built in PEN fault protection

    £270.00 Incl. VAT

    In Stock for Delivery

    Auto reset 5 Pole MCB with built in PEN fault protection · · · Built in PEN fault protection · · No Earth Electrodes Required · · Manual or auto reset function (PEN fault only) · · Available as 40A, 63A, and 100A · · Small footprint · · Simple wire in wire out connection · · Standard 1 Year parts warranty

  • Matt:E Single-phase unit with double pole Type A RCBO for loads up to 7.4kW with Type 2 SPD

    Matt:E Single-phase unit with double pole Type A RCBO for loads up to 7.4kW with Type 2 SPD

    £297.37 Incl. VAT

    Out of Stock

    The SP-R-SPD single-phase protectiondevice offers a compliant, simple, singleconnection centre, for EV charge pointinstallations, allowing connection to theexisting TN-C-S earthing facility withoutthe use earth electrodes. Designed to facilitatecompliance with BS:7671 2018,Amendment 2: 2022 Regulation 722.411.4.1 (iv). The SP-R-SPD single-phase protectiondevice offers a compliant, simple, singleconnection centre, for EV charge pointinstallations, allowing connection to theexisting TN-C-S earthing facility withoutthe use earth electrodes. Designed to facilitatecompliance with BS:7671 2018,Amendment 2: 2022 Regulation 722.411.4.1 (iv). The device comes complete with Type A RCBOand Type 2 SPD giving total protection on yourEV charge point installation. · · · Built in matt:e PEN Fault Protection · · No Earth Electrodes Required · · Helps reduce disruptive and costly groundworks · · Removes the risk of striking buried services · · Simple wire in wire out connection · · Over current protection · · 40A Type A RCBO · · Type 2 SPD · · Standard 1 Year parts warranty